An administrator has two clusters: Site A and Site B.
Async DR is configured between the clusters as follows:
• Site A is the Primary Site
• Site B is the Secondary inactive Site, no VMs running
• Site A is fully in Production
• Site B used as Backup/Disaster Recovery
The customer wants to perform a planned failover between the sites.