New Year Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

Refer to exhibit.

Refer to exhibit.

In this linked architectural model, demolished walls are missing The electrical designer teams from the architect that the walls have been placed in a phase that does not exist in the host model.

Which steps should the designer lake to associate the architectural phases to their phases?

A.

Open Manage Links > Manage Phases

B.

Select the link > Edit Type > Phase Mapping

C.

Select Phases > Graphic Overrides

D.

Open Visibility Graphics > Revit Links > Display Settings

RVT_ELEC_01101 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now RVT_ELEC_01101 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"