Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

The networking team makes changes to the Top of Rack switches to which the Nutanix...

The networking team makes changes to the Top of Rack switches to which the Nutanix cluster are attached. A few VMs are able to communicate with each other on the same node but are unable to connect to other parts of the network.

What is the likely cause of this issue?

A.

There is a VLAN misconfiguration on the VMs.

B.

The vNIC port is disconnected on the affected VMs.

C.

There is a VLAN misconfiguration on the switch.

D.

Jumbo Frame are misconfigured across ports.

NCM-MCI-5.20 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now NCM-MCI-5.20 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"