Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

What is the reason for starting the expansion modules before powering up the control unit,...

What is the reason for starting the expansion modules before powering up the control unit, as recommended by Avaya?

A.

It is simpler to start with the expansion unit at the top and then work your way down.

B.

All expansion units must be powered for the control unit to detect them.

C.

The control unit may not always detect the expansion units if powered up last.

D.

The expansion units require more time to power up than the control unit.

78201X PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 78201X pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"