Pre-Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

An administrator is tasked with deploying a VMware Cloud Foundation (VCF) Workload Domain that meets...

An administrator is tasked with deploying a VMware Cloud Foundation (VCF) Workload Domain that meets the following requirements:

• vSAN ESA as principal storage

• RAID-6 with FTT=2

• Support for Storage Traffic Separation

The administrator is provided the following hardware to perform the task:

• Four ESX hosts, each host contains:

    24 CPU cores

    96 GB memory

    Two 25GbE network NICs

    12 NVMe devices 4 TB each, connected to a single SATA/SAS/NVMe Tri-mode controller What four changes must the administrator make to the hardware before deploying the new Workload Domain? (Choose four.)

A.

Increase the ESX host count to a minimum of seven.

B.

Increase the ESX host count to a minimum of six.

C.

Increase the CPU quantity on each host to a minimum 32.

D.

Increase the Tri-mode controller quantity on each host to two, with six NVMe devices connected to each.

E.

Increase the network NICs on each host to minimum of four 25 GbE network NICs.

F.

Replace the network NICs on each host to a minimum of two 100 GbE network NICs.

G.

Increase the memory on each host to a minimum 128 GB.

3V0-23.25 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now 3V0-23.25 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"