WELL WELL-AP Question Answer
A project team tested their building water supply and found high levels of organic contaminants present. The level detected exceeds the threshold prescribed by the WELL Building Standard™ (WELL™). At minimum, which of the following plumbing fixtures/systems will the project team be required to address?