Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

You are executing the first test run of a test automation suite of 200 tests.

You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.

What is the MOST important FIRST step to be taken immediately afterthe abnormal occurred when executing the 11thtest?

A.

Re-run the test automation suite starting from the 12thtest

B.

Return the database to a consistent state that allows subsequent test to run

C.

Take a backup of the database in its current state. So It can be analyzed later

D.

Re-run the test automation suite starting from the 1sttest.

TAE PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now TAE pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"