New Year Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac75sure

Based on the HA topology image below, which two statements describe the end-state when power...

Based on the HA topology image below, which two statements describe the end-state when power is removed from the ION 1200-S labeled “Active”, assuming that the ION labeled “Standby” becomes the active ION? (Choose two.)

A.

Both the connection to ISP A and the connection to LTE/5G will be usable.

B.

The VRRP Virtual IP address assigned to any SVIs will be moved to the newly active ION.

C.

The newly active ION will send a gratuitous ARP to the LAN for the IP address of any SVIs.

D.

The connection to ISP A will be usable, but the connection to LTE/5G will not.

SD-WAN-Engineer PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now SD-WAN-Engineer pdf
Get 75% Discount on All Products, Use Coupon: "ac75sure"