Spring Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

A security engineer has designed a VPC to segment private traffic from public traffic.

A security engineer has designed a VPC to segment private traffic from public traffic. The VPC includes two Availability Zones. The security engineer has provisioned each Availability Zone with one private subnet and one public subnet. The security engineer has created three route tables for use with the environment. One route table is for the public subnets, and two route tables are for the private subnets (one route table for the private subnet in each Availability Zone).

The security engineer discovers that all four subnets are attempting to route traffic out through the internet gateway that is attached to the VPC.

Which combination of steps should the security engineer take to remediate this scenario? (Select TWO.)

A.

Verify that a NAT gateway has been provisioned in the public subnet in each Availability Zone.

B.

Verify that a NAT gateway has been provisioned in the private subnet in each Availability Zone.

C.

Modify the route tables that are associated with each of the public subnets. Create a new route for local destinations to the VPC CIDR range.

D.

Modify the route tables that are associated with each of the private subnets. Create a new route for the destination 0.0.0.0/0. Specify the NAT gateway in the public subnet of the same Availability Zone as the target of the route.

E.

Modify the route tables that are associated with each of the private subnets. Create a new route for the destination 0.0.0.0/0. Specify the internet gateway as the target of the route.

SCS-C03 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now SCS-C03 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"