Which is a minimum requirement for applying the plans theme?
A.
The project must have at least two management stages
B.
The team managers in the project must prepare team plans
C.
Scope tolerance must be prioritized using MoSCoW
D.
The project plan must be presented as a Gantt chart
The Answer Is:
B
This question includes an explanation.
Explanation:
A minimum requirement for applying the Plans theme in PRINCE2® is that team managers in the project must prepare team plans. This ensures that each part of the project controlled by a team manager is adequately planned in line with the overall project plan and stage plans. These team plans provide detailed guidance on how products will be delivered within the constraints set by the project management.References: PRINCE2® 7 Foundation resources and study materials.
Prince2-Foundation PDF/Engine
Printable Format
Value of Money
100% Pass Assurance
Verified Answers
Researched by Industry Experts
Based on Real Exams Scenarios
100% Real Questions
Get 65% Discount on All Products,
Use Coupon: "ac4s65"