When a risk should be avoided?
The risk event has a low probability of occurrence and low impact.
The risk event is unacceptable - generally one with a very high probability of occurrence and high impact.
The risk can be transferred by purchasing insurance.
A risk event can never be avoided.
B is the correct answer. Most radical avoidance strategy is shutdown the project entirely.