MDS is facing a temporary shortage of Material H which is used to produce all...

MDS is facing a temporary shortage of Material H which is used to produce all three of its products.

In order to maximise its profitability, which product should be manufactured first?

A.

The product using the least amount of Material H per unit.

B.

The product with the highest contribution per kg of Material H.

C.

The product with the highest contribution per unit.

D.

The product with the highest profit per unit.