Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

You are preparing to install a new 2-node AFF A250 system at a customer site...

You are preparing to install a new 2-node AFF A250 system at a customer site with an existing cluster that uses NetApp CN1610 cluster interconnect switches.

In this scenario, what are two valid actions for this installation? (Choose two.)

A.

Add the new nodes to the existing cluster and switches.

B.

Create a new 2-node switched cluster that uses the CN1610 cluster switches.

C.

Create a new 2-node switchless cluster.

D.

Migrate the existing cluster to new switches and add the new nodes.

NS0-184 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now NS0-184 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"