Month End Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: coponace

During the design phase of a StorageGRID implementation project covering three geo-distributed sites, a requirement...

During the design phase of a StorageGRID implementation project covering three geo-distributed sites, a requirement is identified to provide seamless access to object storage based on the proximity of the client to the nearest StorageGRID site.

Which solution meets the requirement?

A.

Configure high-availability groups within Grid Manager, and specify the primary Admin Node in the priority order.

B.

Enable the Load Balancing service, and set up load balancing on multiple Gateway Nodes in each site.

C.

Create LACP port channels to allow clients to use multiple network ports to connect to the Grid Network.

D.

Leverage a supported third-party load balancer and configure GSLB to direct client traffic accordingly.

NS0-077 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now NS0-077 pdf
Get 70% Discount on All Products, Use Coupon: "coponace"