Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the...

A customer has a G6 AHV cluster with 4x10GbE NICs on each node and the following configuration:

* Networking is set to default

* Only two NICs are connected

The customer receives the following critical message:

The NIC is disconnected from the switch, or the switchport is failing.

What should the consultant verify to resolve the issue?

A.

The NICs are configured for active-backup.

B.

The VLANs are configured correctly on the switch or tagged on the cluster.

C.

The other two 10GbE connections are removed from the default bond.

D.

The NICs are connected for balance-slb.

NCS-Core PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now NCS-Core pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"