Weekend Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

A new employee has inherited a partially configured Disaster Recovery (DR) schema.

A new employee has inherited a partially configured Disaster Recovery (DR) schema. Source workloads have been identified and Nutanix Guest Tools has been installed.

There are two Protection Polices in place, one with an asynchronous schedule with a 1-hour RPO and a second policy utilizing synchronous replication. All of these workloads need to be recovered at a DR location and this will be orchestrated by Prism Central Recovery Plans.

What is the best way to setup this recovery orchestration?

A.

Identify the workload startup order and create Recovery Plans corresponding to the startup order.

B.

Setup a Recovery Plan for the asynchronous replication and convert the synchronous replication to a Protection Domain.

C.

Setup two Recovery Plans, one for the asynchronous replication and one for the synchronous replication.

D.

Setup a single Recovery Plan utilizing stages of recovery delays as needed.

NCP-MCI-6.10 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now NCP-MCI-6.10 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"