Nutanix NCP-MCI-6.10 Question Answer
A new employee has inherited a partially configured Disaster Recovery (DR) schema. Source workloads have been identified and Nutanix Guest Tools has been installed.
There are two Protection Polices in place, one with an asynchronous schedule with a 1-hour RPO and a second policy utilizing synchronous replication. All of these workloads need to be recovered at a DR location and this will be orchestrated by Prism Central Recovery Plans.
What is the best way to setup this recovery orchestration?