Pre-Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

After a failover and stabilization of workloads at the recovery AZ, an administrator removes several...

After a failover and stabilization of workloads at the recovery AZ, an administrator removes several VMs from the protection policy because they are no longer required. Which action should be performed as part of post-failover cleanup to prevent unnecessary storage consumption?

A.

Recreate the recovery plan.

B.

Reconfigure the replication schedule.

C.

Delete the associated recovery points.

D.

Disable Nearsync replication.

NCP-BC-7.5 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now NCP-BC-7.5 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"