11.11 Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

A network engineer is implementing a new connection between core switches.

A network engineer is implementing a new connection between core switches. The engineer deploys the following configurations:

Core-SW01

vlan 100

name

interface Ethernet 1/1

channel-group 1 mode active

interface Ethernet 1/2

channel-group 1 mode active

interface port-channel 1

switchport mode trunk

switchport trunk allow vlan 100

Core-SW02

vlan 100

name

interface Ethernet 1/1

switchport mode trunk

switchport trunk allow vlan 100

interface Ethernet 1/2

switchport mode trunk

switchport trunk allow vlan 100

interface port-channel 1

switchport mode trunk

switchport trunk allow vlan 100

Which of the following is the state of the Core-SW01 port-channel interfaces?

A.

Incrementing CRC errors

B.

Error disabled

C.

Administratively down

D.

Suspended

N10-009 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now N10-009 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"