A network administrator installs a node that requires a media converter to connect Ethernet to fiber but sees no link light on the node. The administrator notices the following:

    Both terminating points are properly seated.

    Both the fiber and Ethernet cables have been successfully tested.

    The media converter is turned on.

    The switchport is configured as half duplex.

Which of the following is the reason the link light is not on?

A.

The TX/RX connection is transposed.

B.

The switchport is misconfigured.

C.

One of the cables has a short.

D.

The switchport interface has errors.

N10-009 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now N10-009 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"