What rating system should a project use if 55% of the project's gross floor area...

What rating system should a project use if 55% of the project's gross floor area is appropriate to certify under LEED BD+C and 45% is appropriate under LEED O+M?

A.

LEED Building Design and Construction

B.

LEED Operations and Maintenance

C.

LEED Green Associate must decide which rating system is most applicable

D.

Project team must decide which rating system is most applicable