The Commissioning (Cx) Process has been structured to coincide with the phases of a generic...

The Commissioning (Cx) Process has been structured to coincide with the phases of a generic project in which of the following sequences of phases?

A.

OPR, Design, Construction, Operations and Maintenance

B.

Basis of Design (BOD), OPR, Cx, Construction

C.

Pre-Design, Design, Construction, Occupancy and Operations

D.

Basic Design, Construction, Cx, Owner’s Project Requirements (OPR)