A project ' s installed water fixtures do not exceed WaterSense maximum levels.

A project ' s installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

A.

Compliance Path 2: Usage-Based Calculation; prescriptive compliance confirmation

B.

Compliance Path 2: Usage-Based Calculation; appliance water calculations

C.

Compliance Path 1: Prescriptive Achievement; indoor water use calculations

D.

Compliance Path 1: Prescriptive Achievement; product cutsheets

LEED-AP-BD+C PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now LEED-AP-BD+C pdf
Get 70% Discount on All Products, Use Coupon: "coponace"