When should component integration tests be carried out?
A.
Integration tests should always be done after system tests
B.
Integration tests should be done at the customer's site, after acceptance tests
C.
Integration tests can be done before or after system tests
D.
Integration tests should always be done before system tests
The Answer Is:
D
This question includes an explanation.
Explanation:
Component integration tests are designed to verify the interactions and interfaces between integrated components. These tests should be carried out after component testing (where individual components are tested in isolation) but before system testing (where the entire system is tested as a whole). This ensures that any issues arising from the integration of components are identified and resolved early in the testing process, making option D the correct answer.
ISTQB-CTFL PDF/Engine
Printable Format
Value of Money
100% Pass Assurance
Verified Answers
Researched by Industry Experts
Based on Real Exams Scenarios
100% Real Questions
Get 65% Discount on All Products,
Use Coupon: "ac4s65"