Production Line 1 is able to complete 500 units per shift.

Production Line 1 is able to complete 500 units per shift. Production Line 2 is able to finish 1,500 units per shift. Production Line 2 is 3 times faster than Production Line 1. This analysis is an example of ______________ Scale Data.

A.

Nominal

B.

Ratio

C.

Ordinal

D.

Interval