Your customer plans to replace a legacy HPE BladeSystem solution with the HPE Synergy platform.

Your customer plans to replace a legacy HPE BladeSystem solution with the HPE Synergy platform.

The customer requirements include:

    30 compute nodes to support their virtualization workloads

    Redundancy within the management subsystem

    An in-frame storage solution to support vSAN

    A guidance/automation technology with HPE Aruba to virtualize WWNs

    Simplified management with a single logical enclosure

You are reviewing the following proposal:

    3 x HPE Synergy 12000 frames

    2 x HPE Virtual Connect SE 100Gb F32 Modules for Synergy

    4 x HPE Synergy 50Gb Interconnect Link Modules

    3 x HPE D3940 Storage Modules with maximum number of drives

    6 x HPE Composer2 + 30 x HPE OneView Advanced licenses

    30 x SY 480 Gen11 compute modules, each with 2 CPUs and appropriate mezzanine cards

Which statement about the proposal is true to help meet the customer requirements?

A.

Additional HPE OneView Advanced licenses should be added for the HPE Virtual Connect modules and HPE D3940 Storage Modules.

B.

HPE 32Gb Fibre Channel switches should be added to the proposal to enable WWN virtualization and profile mobility.

C.

Each frame should be equipped with two HPE 12Gb SAS switches to provide connectivity between compute nodes and D3940 Storage Module.

D.

3 x HPE Composer 2 modules can be removed from the proposal, as you need one HPE Composer2 module per HPE Synergy frame for enhanced availability.

HPE7-V01 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now HPE7-V01 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"