Claim Your Black Friday Savings: 75% Off! Apply coupon code below to get your exam bundles! - Ends in 0d 00h 00m 00s - Coupon code: ac75sure

Refer to the partial exhibit from an HPE Aruba Networking CX 8325:A new port on...

Refer to the partial exhibit from an HPE Aruba Networking CX 8325:

A new port on 1/1/25 must be reconfigured for an ISP router with the IP address of 10.10.10.2/30.

What is the correct configuration to achieve the layer-3 configuration without the risks of layer-2 loops?

A.

interface 1/1/25

no shutdown

vlan access 1

exit

!

interface vlan 1

ip address 10.10.10.2/30

exit

B.

interface 1/1/25

enable

routing

ip address 10.10.10.2/30

exit

C.

interface 1/1/25

no shutdown

routing

ip address 10.10.10.2/30

exit

D.

interface 1/1/25

enable

vlan access 1

exit

!

interface vlan 1

ip address 10.10.10.2/30

exit

HPE7-A08 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now HPE7-A08 pdf
Get 75% Discount on All Products, Use Coupon: "ac75sure"