Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

Your customer plans to deploy a VMware ESXi with HPE Synergy platform.

Your customer plans to deploy a VMware ESXi with HPE Synergy platform. They plan to use Distributed Switches and DRS cluster

You are preparing a proposal with the following components:

- HPE Synergy frame with ten HPE Synergy 480 Gen10 Plus compute modules

- two HPE Virtual Connect SE 100Gb F32 Modules for Synergy

- an appropriate number of the vSphere Standard licenses for each compute node

- one HPE D3940 Storage Modules with 40 SSDs - all required cables and options

Which statement about this proposal is true?

A.

One HPE Virtual Connect SE 100Gb F32 Module for Synergy should be replaced with 50GD/S ILM

B.

vSphere Standard licenses should be replaced with Enterprise Pius licenses to enable requested features

C.

2 additional HPE Synergy 480 Gen10 Plus compute modules can be added to this setup

D.

20 SSD drives should be removed from this setup, as D3940 supports only 20 SSD or SAS drive.

HPE0-S60 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now HPE0-S60 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"