Pre-Summer Sale Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ac4s65

A junior architect designed a solution based on HPE Synergy that must meet the following...

A junior architect designed a solution based on HPE Synergy that must meet the following requirements:

    Support at least 30 HPE Synergy 480 Gen10 Plus compute modules

    Interconnect modules must provide MAC and WWN virtualization

    All HPE Synergy frames must formulate a single management entity

    The management appliance should not be a single point of failure

    Connectivity to FC array should be available to all compute nodes

The proposal consists of:

    3 HPE Synergy 12000 frames

    6 HPE Composer 2 modules

    2 HPE Virtual Connect SE 100Gb F32 Module

    4 HPE Synergy 50Gb Interconnect Link Module

Which statements about this proposed design are true? (Select two)

A.

FC upgrade licenses for HPE Virtual Connect SE 100Gb F32 Module must be added.

B.

HPE Synergy 50Gb ILMs must be replaced with HPE Virtual Connect SE 100Gb F32 modules.

C.

Remove 4 HPE Composer 2 modules from the design, as they are not required.

D.

The selected interconnect modules do not provide the requested WWN virtualization.

E.

The current setup can support up to 18 HPE Synergy 480 Gen10 Plus compute modules.

HPE0-S59 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now HPE0-S59 pdf
Get 65% Discount on All Products, Use Coupon: "ac4s65"