Data center L1 layer business deepening design goal (multiple choice)

Data center L1 layer business deepening design goal (multiple choice)

A.

On the basis of the summary audit plan (bidding plan), the needs of the owner are further clarified, and the boQ at the design plan level is refined, and the design depth reaches the construction drawing standard

B.

Improve the design interface interface to ensure that the design of the respective systems of the project is consistent and coordinated with the professional design of architecture, structure, water, electricity, HVAC, decoration and other professions

C.

Provide technical basis for the bidding of installation units (subcontracted construction units), equipment suppliers and project acceptance

D.

Combined with the actual situation of the project, the work responsibility interface of Huawei (including tripartite purchased parts), subcontractors, and customers is determined, and the project purpose SOW (scope of work) and support determination RM (Responsibility)

H19-321 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now H19-321 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"