Huawei H13-629 Question Answer
Production time is Monday to Friday 8:00 to 18:00. There are three LUNs, respectively LUN1, LUN2, LUN3, LUN1 with a size of 500G, all IO.
The average response time needs to be within 5ms, the size of LUN2 is 4TB, the coexistence of hot and cold data (with 12.5% of the hot data), andthe size of LUN3 is 10TB. If performance requirements are not high and the engineer plans to use SmartTier, which of the following description is correct? (Multiple choice)