During STP calculation, the port cost is associated with the port bandwidth by default.

During STP calculation, the port cost is associated with the port bandwidth by default. Which of the following statements about the relationship between port cost and port bandwidth is true?

A.

The port cost varies randomly according to port bandwidth.

B.

A higher port bandwidth indicates a smaller port cost.

C.

The port bandwidth is equal to the port cost.

D.

A higher port bandwidth indicates a larger port cost.