Summer Special Limited Time 60% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 8w52ceb345

In the project, the two points are separated by 4.

In the project, the two points are separated by 4.5km. In order to realize the data return between the two points, what information does the engineer need to collect?

A.

Bandwidth requirements

B.

Obstacle information between two points

C.

2.4G channel usage between two points

D.

5G channel usage between two points

E.

Terminal type

H12-322 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now H12-322 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"