Universal Containers (UC) uses two contractors, Contractor 1 and Contractor 2, to perform repair work.

Universal Containers (UC) uses two contractors, Contractor 1 and Contractor 2, to perform repair work. Contractor 1 has provided Services for UC for a longer period of time and is considered to have more repair work expertise than Contractor 2. How should the Consultant configure the Contractors’ experience?

A.

Assign Contractor 2 as an Excluded Resource.

B.

Assign Contractor 1 and 2 different capacities for repair work.

C.

Assign Contractor 1 as a Preferred Resource.

D.

Assign Contractor 1 and 2 different Skill Levels for repair Work Type.