During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer...

During a hardware NDU from a FlashArray//X20R3 to an X20R4-LL (low-line) model, the Implementation Engineer encounters a failure during the power supply check. Voltage readings are correct. What is a likely cause of this failure?

A.

There are more than 10 drives installed in the chassis.

B.

The power cables are NOT fully seated in the array.

C.

Purity does NOT recognize the power supplies installed in the array.