An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a...

An Implementation Engineer is performing a hardware NDU from a fully populated FlashArray//X90R3 to a FlashArray//XL that already contains 20 DFM-Ds. The drive transfer is complete, and the //XL is still in SPM (Shelf Mode). What is the next step the Implementation Engineer should take to continue the upgrade?

A.

Hot swap and move each DMM into any open //XL slot.

B.

Evacuate and remove each DMM one-by-one then set aside.

C.

Evacuate DMM's as a datapack then install into any slot in //XL.