An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full.

An Implementation Engineer is performing a capacity consolidation on an X50R2 that is 83% full. The starting config is X50R2-20/10-22/0. The end config is X50R2-91/0. What steps should the Implementation Engineer follow to complete the work?

A.

Evac the chasses drives, install the new 91TB chassis data pack, and evac SH0.

B.

Move the 20TB chassis DP to SH0, install the new 91TB chassis DP, evac the 10TB chassis DP, and evac SH0.

C.

Evac SH0, evac the 20TB chassis DP, install the new 91TB DP, and evac the 10TB chassis DP.

FlashArray-Implementation-Specialist PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now FlashArray-Implementation-Specialist pdf
Get 75% Discount on All Products, Use Coupon: "ac75sure"