A customer has a DirectFlash Shelf installed on a FlashArray//X90R4.

A customer has a DirectFlash Shelf installed on a FlashArray//X90R4. The 208V rack PDUs are full, but there are five 120V connections available at the top of the rack. What should the Implementation Engineer understand about powering the DirectFlash Shelf in this scenario?

A.

The Shelf requires at least 180V to operate and Will NOT power on With 120V.

B.

The shelf can be fully supported by 120V for the duration of its service life.

C.

The shelf can operate temporarily on 120V, but 208/240V should be used as soon as it's available.