Esri EGMP2201 Question Answer
An organization uses a two-way replica to share edits for a polygon feature class with a field office. After months of synchronizing edits, a schema change takes place using the following workflow;
• A new field called a legal_area is added to a polygon feature class in the parent geodatabase
• An editor uses the Calculate Geometry tool to calculate legal_area for each polygon
• The child geodatabase does not have the legal_area field in the polygon feature class
• The parent geodatabase synchronizes the replica to the child geodatabase
What happens during synchronization?