What or who determines the baseline assumptions in EDGE?
A.
EDGE software users
B.
EDGE Auditors
C.
Market survey of typical construction practices
D.
Market survey of best construction practices
The Answer Is:
C
This question includes an explanation.
Explanation:
The baseline assumptions in EDGE software, known as the Base Case, are critical for calculating resource savings and are determined using standardized data. The EDGE Methodology Report explains: "Baseline assumptions in EDGE, referred to as the Base Case, are determined by market surveys of typical construction practices in the project’s country, reflecting common materials, systems, and design practices for the selected typology and location" (EDGE Methodology Report Version 2.0, Section 3.1: Base Case Determination). Option C, market survey of typical construction practices, aligns with this methodology. Option A (EDGE software users) is incorrect, as users do not set the baseline; they input project-specific data. Option B (EDGE Auditors) is also incorrect, as auditors verify compliance, not establish baselines. Option D (market survey of best construction practices) is wrong because EDGE uses typical practices, not best practices, to create a realistic benchmark, as clarified in the EDGE User Guide: "The Base Case reflects typical local practices, not best practices, to ensure a fair comparison for resource savings" (EDGE User Guide, Section 2.3: Using the EDGE App).
[Reference: EDGE Methodology Report Version 2.0, Section 3.1: Base Case Determination; EDGE User Guide Version 2.1, Section 2.3: Using the EDGE App., ]
EDGE-Expert PDF/Engine
Printable Format
Value of Money
100% Pass Assurance
Verified Answers
Researched by Industry Experts
Based on Real Exams Scenarios
100% Real Questions
Get 65% Discount on All Products,
Use Coupon: "ac4s65"