A customer has ordered a two-engine VPLEX cluster to be installed in a custom rack.

A customer has ordered a two-engine VPLEX cluster to be installed in a custom rack. A minimal VNX5300 is already installed in the middle of the rack, occupying nine rack unit spaces.

What is the correct approach to deploy the two-engine VPLEX cluster?

A.

The engines and SPSs can be placed under the VNX5300 and the other components above the VNX5300 using longer cables.

B.

Use a rack with sufficient space to install all the VPLEX cluster components together according to the predefined EMC layout.

C.

The installation of a two engine cluster is not supported in a customer rack without a formal EMC RPQ.

D.

The EMC account team must order a factory installed VPLEX two engine configuration and ship the custom install VPLEX back to EMC.

E20-260 PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now E20-260 pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"