An implementation engineer is deploying a new VxRail cluster.

An implementation engineer is deploying a new VxRail cluster. What should they confirm before installing the hardware?

A.

Service laptop must be on the same IP network as the iDRACs

B.

At least 36 in (92 cm) clearance exists in front of and behind the cabinet

C.

Power distribution must support the power rating of a single node

D.

Single power zone must be used with adequate power cables