EMC D-PSC-MN-01 Question Answer
A platform engineer is creating a new Dell EMC PowerScale cluster that must meet SEC 17a-4f rules. Node 1 is powered on and cabled.
What action is needed to meet the requirement?
EMC D-PSC-MN-01 Question Answer
A platform engineer is creating a new Dell EMC PowerScale cluster that must meet SEC 17a-4f rules. Node 1 is powered on and cabled.
What action is needed to meet the requirement?