A deployment engineer is preparing to install three PowerEdge XE9680 servers in a rack supplied...

A deployment engineer is preparing to install three PowerEdge XE9680 servers in a rack supplied by the customer.

What must they before going on-site to install the servers?

A.

The rack can accommodate the length of the servers.

B.

The customer completed the required training on the server.

C.

The rack will have a top-of-rack switch.

D.

The rack has at least six PDUs and two power sources.