You are the Test Manager on a project to replace an old sales and merchandising...

You are the Test Manager on a project to replace an old sales and merchandising system with one that will be based on modern platforms.

The main requirements for the system are:

    Loading sales data, sent electronically from the stores each evening, into a central database.

    Producing sales reports for the merchandisers.

    Producing forecast reports, used to predict demand.Loading sales data and producing reports with the current system has frequently taken longer than the overnight processing window allows. The Data Centre Manager requires that all batch processing takes at least 10% less time than currently.The Sales and Merchandising Manager is more concerned about usability because the parameter entry will be complex.Which option contains two key considerations that would need to be added to your test approach?

A.

Full user experience testing in a model office lab and load testing on user parameter entry

B.

Usability testing during system testing; performance efficiency testing post system test phase

C.

Usability testing during system testing and acceptance testing in pre-prod; performance testing in pre-prod

D.

Usability testing in pre-prod by the team; performance efficiency testing in pre-prod too

CTAL-TM PDF/Engine
  • Printable Format
  • Value of Money
  • 100% Pass Assurance
  • Verified Answers
  • Researched by Industry Experts
  • Based on Real Exams Scenarios
  • 100% Real Questions
buy now CTAL-TM pdf
Get 60% Discount on All Products, Use Coupon: "8w52ceb345"