iSQI CTAL-TAE_V2 Question Answer
A release candidate of a SUT, after being fully integrated with all other necessary systems, has successfully passed all required functional tests (90% were automated tests and 10% were manual tests). Now, it is necessary to perform reliability tests aimed at evaluating whether, under certain conditions, that release will be able to guarantee an MTBF (Mean Time Between Failures) in the production environment higher than a certain threshold (expressed in CPU time). Which of the following test environments is BEST suited to perform these reliability tests?

