Which of the following phases of an asset’s lifecycle would typically be designated a design defect?
A.
Operational
B.
Maintenance
C.
Installation
The Answer Is:
C
This question includes an explanation.
Explanation:
The best answer is Installation because, from the listed choices, it is the lifecycle phase closest to creation, acquisition, construction, and commissioning, where design-related defects are normally embedded into the asset before it enters full operation. A design defect is not created by maintenance execution; maintenance may reveal it, compensate for it, or suffer because of it, but maintenance is not the origin of a design defect. Operational is also not the best answer because operations may expose the defect through poor reliability, unsafe performance, low output, or recurring failure, but the defect itself was introduced earlier in the asset lifecycle. Installation is therefore the strongest available option because it represents the pre-operational stage where design decisions, construction quality, installation practices, and commissioning controls determine whether defects are built into the asset. In CRL Asset Management, this is why lifecycle thinking matters: defects introduced early can create years of maintenance cost and reliability loss. Asset lifecycle reliability guidance emphasizes applying reliability methods at every lifecycle stage to improve value and prevent defects from becoming operational burden.
CRL PDF/Engine
Printable Format
Value of Money
100% Pass Assurance
Verified Answers
Researched by Industry Experts
Based on Real Exams Scenarios
100% Real Questions
Get 65% Discount on All Products,
Use Coupon: "ac4s65"