A lengthy power outage led to unavailability of time critical services resulting in considerable losses.

A lengthy power outage led to unavailability of time critical services resulting in considerable losses. It was determined that a backup electrical generator did not work as intended at the time of the incident due to lack of fuel. What should the security consultant FIRST Investigate?

A.

Maintenance procedures

B.

Supplier contracts

C.

Failover designs

D.

Product catalogs