An x-bar control chart has been established with control limits of 3.

An x-bar control chart has been established with control limits of 3.245 and 3.257, n = 5. An engineer collects the following sample and plots the average on the control chart: 3.257, 3,256, 3. 258, 3.259.

A.

the process is out of control

B.

the process is not out of control

C.

the engineer misused the control chart

D.

the control limits are incorrect