What are the four methods a project manager should use to prove project requirements are met?
A.
Planning, specifying, negotiating, and payment
B.
Testing, analysis, inspection, and interpolation
C.
Interviewing, observing, inspecting, and reporting
D.
Analysis, reporting, measurement, and permit sign-off
The Answer Is:
B
This question includes an explanation.
Explanation:
The IFMA Project Management competency highlights that ensuring project requirements are met involves testing, analysis, inspection, and verification methods.
Testing: Conducting controlled experiments or trials to validate performance.
Analysis: Evaluating results to ensure compliance with design and functional specifications.
Inspection: Physically examining equipment or processes for adherence to standards.
Interpolation: Utilizing data from tests to predict performance in similar conditions.
This method ensures that all aspects of project requirements are validated before project completion. Other options, such as negotiation (A) or interviewing (C), are more related to stakeholder communication rather than verification.
CFM PDF/Engine
Printable Format
Value of Money
100% Pass Assurance
Verified Answers
Researched by Industry Experts
Based on Real Exams Scenarios
100% Real Questions
Get 60% Discount on All Products,
Use Coupon: "8w52ceb345"