Construction Specifications Institute CDT Question Answer
Which of the following statements is correct?
Contract documents are complementary
Requirement of one of the contract documents may be superseded by others
Specifications take precedence over drawings
The architect/engineer may require the contractor to perform at a higher level than the contract documents require